Technical Studies

返回

Trench Excavating Evaluation and Geophysical Survey in ChuShan Chelungpu Fault

Geophysical methods were used for evaluating trench excavating in Chelungpu fault. According to the results of the survey, most of the boundary is conformed to the design. However, western side of the trench suffered serious weathering and may slightly broke.