Technical Studies

返回

The Feasibility Study of Gaotai Reservoir(1) –Engineering Geological Investigation

Water Resources Agency planed to build Gaotai Dam in the upstream of shihmen Dam for storaging more water resources. A previous study confirmed that Gaotai dam was the possible dam site in Da-Han River and carried out relevant investigation in 2004. Based on previous investigation results of topographic surveying (1:1000), geological mapping, drilling, in situ and laboratory rock mechanics tests, the proposed dam site of Gaotai reservoir is suitable for building a new gravity dam. Hence, for feasibility study further site investigation is needed. This project is based on geological target for the palning of Gaotai Dam.